Zak here from Nomac Built. We're back on site at Project Devlyns in Birchs Bay, and we've had a big renovation transformation over the last couple of weeks. Last time we were here, this was all bare bones framing. Here's what the team and our trade partners have been up to.
Watch the video:
Our friends at Kaines Plastering have done a great job on the high vaulted ceiling. Around the room there are some arched doorways and square-set details, all the way through to the attic loft.
The joinery from our friends at Insite Solutions Joinery has definitely delivered. It's a high-end finish featuring stone benchtops and vignette fronts, accented with gold detailing framing the island. Getting the joinery locked in early is what makes a finish like this possible, and we cover why in our guide to joinery planning before rough-in.
Our friends at BTS Tiling have done a great job on the floor tiling, as well as the feature wall and the laundry and WC. Our client Joe hand selected the grey coppery tones, which accent the joinery beautifully throughout the place.
We've also got Rock Electrical on site doing a beautiful job with the fit-off, including a massive pendant light over the island bench. But it's not only the electrical you can see, it's what you can't see. Under the whole floor system they've installed underfloor tile heating, which gives comfort to this space all year round.
Our site foreman Nick has also made a couple of design calls on the fly this week. An old doorway has been turned into an arched niche rather than enclosed, and next week the team will build hardwood balusters that wrap the stairs and continue up to form the handrail. BTS Tiling is also underway on the splashbacks and skirt tiles in the laundry and WC, with Kaines Plastering booked in next week to finish off.
Over the next couple of weeks, we're going to finish off all the fit-out work, get the kitchen operational and make this space liveable so our client can host their guests. There are some great highlights on this project that we're eager to share with you all. Stay tuned for the grand reveal.

October 12, 2026
Project Lumeah, our first Bruny Island build, is into the finishing touches, with a custom kitchen, Tasmanian Oak floors and a Christmas handover in sight.
view project
October 12, 2026
Slab day on Bruny Island: a 300 sqm slab poured and finished for Project Alonnah, our second build on the island and a two-storey shed home.
view project
September 28, 2026
On site at Project Marguerite in Ranelagh with Andy Armstrong Architects, a high-end build that's already overcome a tricky start.
view project
August 5, 2026
Zak shares a mid-year update on Nomac Built's current projects, from a new Birchs Bay kitchen renovation to milestones on both Bruny Island builds.
view project
August 9, 2026
Windows are in and the cladding is nearly finished at Oldham Road, with the Nomac Built team now moving into the fit-out stage of this detached extension.
view project
July 31, 2026
A high-end kitchen renovation kicks off at Devlyns Road with Andy Armstrong Architects, alongside a second project now underway in Birchs Bay.